EQUIPMENT DETAILS Main Fire Pumps

Discussion in 'FIRE' started by Mannan, May 30, 2016.

  1. Mannan

    Mannan Administrator Staff Member



    [​IMG]

    [​IMG]


    الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين



    EQUIPMENT DETAILS Main Fire Pumps


    SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE Work Plan



    [​IMG]

    EQUIPMENT DETAILS Main Fire Pumps

    صيانة دورية جداول جاهزة مضخات الحريق الرئيسة مضخة

    Capacity
    Qty: Lot
    Make & Model

    Location

    Main Fire Pumps

    Consumable Spare Parts

    Task Description
    W / Weekly M / Monthly Q / Quarterly SA/ Semi/Annually
    A/ Annually SST / Seasonal Start/Up SSH / Season Shut Down
    2W M 3M
    6M A Notes

    Item Description
    Qty Notes

    Check for any leakage and repair
    Check the pump head at nominal flow and
    at 150 % or nominal flow to ensure
    conformity with design requirement.
    Check for the relief valve calibration by
    gradually closing the test line
    Check pressure switch setting for automatic
    cut – in and cut-of jockey pump
    Grease and oil the bearing
    Check power is healthy on panel and clean
    Check bearing and mechanical seal
    Clean and paint.
    Make general cleaning , check impeller,
    clean housing
    Check seals and change if necessary
    Check the motor full load current by
    manipulating the flow
    Inspect unit for unusual noise and/or vibration, ensure that it is in good working order.
    Provide lubrication, if necessary.
    If unit is not running or an identified problem requires the unit to be serviced,

    perform ALL Non-Critical Tasks listed below

    Flush and clean strainers.
    Check operation of gauges and record pressures and temperatures.
    Inspect seals and packing, tighten or replace as necessary.
    Lubricate impeller shaft bearings.
    Inspect motor and pump alignment.
    Other recommended tasks
    Inspect mounting bolts and vibration isolators of the pump under load conditions.
    Start and stop pump, noting any vibration and overall performance.
    Inspect drive shaft coupling.


    Notes
    Use additional sheets if required
    PPM routines based on Complete
    Running hour where recommended by the Manufacturer